js_composer
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gricspbr/public_html/wp-includes/functions.php on line 6114\u2026As Ambode Inspects Oshodi-Abule-Egba BRT Corridor, Ojokoro Road Network<\/em><\/strong><\/p>\n \u2026 Appeals For Residents\u2019 Patience, Support For Ongoing Projects Across State<\/em><\/strong><\/p>\n \u00a0<\/em><\/p>\n The contractor handling the construction of 10-lane Oshodi-Murtala Muhammed International Airport Road, Messrs Hi-tech Construction Company has acquired a new Wirtgen WR 250 Recycler machine to speed up work on the construction work, with an assurance to deliver the project by December 2018.<\/p>\n The Lagos State Government had embarked on the reconstruction of the Airport Road to transform it from the state of decay to international standard being a major gateway to the State and Nigeria.<\/p>\n The scope of the project includes two flyovers, one U-turn Bridge, five pedestrian bridges, and multiple laybys, among others.<\/p>\n Speaking while unveiling the new machine during an extensive inspection tour of ongoing projects across the State by the Governor, Mr Akinwunmi Ambode, Hi-tech\u2019s Managing Director, Mr Ivan Becker said the new equipment which has the capacity to construct 400metres daily would go a long way to facilitate the delivery of the Airport Road on schedule.<\/p>\n He said the Wirtgen WR 250 Recycler was capable of 12,000 square metres performance maximum daily, adding that the \u201cmachine can mix two per cent bitumen, one per cent cement, 50 per cent stone base and 50 per cent reclaimed existing asphalt with water which makes road construction with the machine faster and better with a higher quality.\u201d<\/p>\n Responding, the Governor, who was represented by Commissioner for Works and Infrastructure, Mr Adebowale Akinsanya, said it was gratifying to note that the project was progressing well with all the components now at advanced stages, just as he expressed optimism that the new equipment would facilitate prompt delivery of the project.<\/p>\n The Governor, who also inspected the progress of work on Oshodi-Abule Egba Bus Rapid Transit (BRT) corridor and construction of network of roads in Ojokoro, specifically appealing to residents to bear with the State Government over inconveniences they might be experiencing as a result of the multiple infrastructural projects going on across the State, saying that all hands were on deck to deliver the projects on schedule.<\/p>\n He said aside the fact that various measures had been put in place to mitigate impact of the construction on residents, more impactful projects would be delivered to make life comfortable for residents and visitors.<\/p>\n<\/a>