The Berger axis which is one of the major gateways to the State of Excellence is also witnessing massive expansion projects by the present administration.
The expansion projects at Berger include the construction of about 700 meters slip road through which traffic outward Lagos-Ibadan Expressway can connect Omole Phase Two, Magodo Phase One and Olowoora.
The road, which was designed with drainage channels, sidewalks and street light, is about 6 meters wide and can conveniently accommodate two vehicles at a time.
Apart from the Pedestrian Bridge which has been completed, there are also expanded lay-bys and reservation areas at both sides of the Berger Bus Stop to facilitate easy pulling off of commercial and private vehicles from the main expressway, while massive road improvement, construction of lay-bys and reservation projects are equally on-going under the bridge.
The government is also constructing iron barricades to facilitate free flow of traffic and forestall incidents of accidents associated with pedestrians crossing the road without recourse to the foot bridge.